Info-accessibilité
En raison de l'entretien préventif, les ascenseurs seront hors service entre 9h00 et 15h00 aux gares et aux dates indiquées ci-dessous : 6 mai 2022 - Ahuntsic 6 mai 2022 – Sauvé 6 mai 2022 – Montréal-Nord - Saint-Léonard 6 mai 2022 - Montréal-Nord - Saint-Michel 6 mai 2022 – Saint-Hubert (Mont-Saint-Hilaire) 10 mai 2022 – Anjou 12 mai 2022 – Mascouche 17 mai 2022 – Terrebonne 19 mai 2022 - Repentigny 24 mai 2022 – Pointe-aux-Trembles
Commissioned on December 1st, 2014, the Mascouche line will transport, after 5 years of operation, 11,000 passengers daily from the north-eastern suburbs to downtown Montréal in 65 minutes. The RTM 6th commuter train line required the construction of 10 new train stations, several civil engineering structures and 13 km of new railway track.
Commissioning date |
2014 |
Outsourced operator |
CN |
Rolling stock (RTM property): |
Dual-mode (electric – diesel) |
Route |
52 km |
Stations |
13, including 10 new |
Park-and-ride lots |
8 |
Daily departures |
16 |
Weekend service |
No |
Terminating station |
Central Station |
Connection with the metro |
|
Average daily ridership (2016) |
7,400 |